South Central Railway discovered during pre-launch inspection that a newly built station has platform capacity for only 18 coaches, but six of the scheduled express trains operate with 22 to 24 coaches, creating an immediate operational constraint.
Severity: 2.5/10Source: The HinduLocation: null, null