Lineage, which operates a facility damaged in a June 17 fire suspected to have been sparked by rooftop solar equipment from subcontractor Altus Power, has accused the company of obstructing demolition efforts at the site.
Severity: 2.5/10Source: Los Angeles TimesLocation: null, null