According to Mr Umahi, the standard engineering design for headroom is 5.6. The post Iddo bridge reconstruction to be delivered by end of 2026, says Umahi appeared first on Peoples Gazette Nigeria .
This is an ingested summary. Full reporting is available at the primary source below.